Experts from CM-Consult fully adapted GanttChart for IBM Rational ClearQuest v.8.0 . Currently GanttChartforClearQuest supports the following versions of IBM Rational ClearQuest: 6.x, 7.x, and 8.x. Besides, in release 1.4 of GanttChart performance of the application when displaying a large number of tasks was improved.
GanttChart for ClearQuest is a unique plug-in for IBM Rational ClearQuest developed by CM-Consult. It allows project managers, executives, and all team members to view tasks from the project plan. Project managers like GanttChart because it is easy to use. With two clicks GanttChart allows re-planning tasks, and automatically updates the corresponding task fields. That is GanttChart for ClearQuest allows you to plan tasks directly from ClearQuest in real time mode.
CM-Consult is now offering one year fixed-term licenses for packages that were previously available with a perpetual license only. Some of CM-Consult product packages are now available with both perpetual and fixed-term licenses. CM-Consult company gathered feedback from its clients and concluded that it would be benefitial for them to have an opportunity to choose between perpetual and fixed-term licenses when purchasing CM-Consult products.
One year fixed-term licenses offer several benefits. Fixed-term licenses:
- Provide a lower introduction cost than perpetual licenses and offer a lower-cost option for projects of a shorter duration.
- Include support and maintenance, so there is no additional maintenance cost.
- May be used to provide a better method to control and allocate cost to individual projects and may allow more flexibility in categories of procurement funds.
The GanttChart for ClearQuest tool has proved to be a very successful add-on for the ClearQuest system. It significantly simplifies the planning process in ClearQuest. Standard integration of IBM Rational ClearQuest and MS Project allows solving a number of same tasks that GanttChart solves, but with GanttChart it is much more convenient to work with a large number of heterogeneous relations between change requests, including hierarchical and sequential relations. Besides, there is no need to use two tools at the same time – a project manager can well do with ClearQuest with GanttChart add-on installed.
Our experts have gained much use from this tool. GanttChart flexible settings allow configuring the necessary representation of a Gantt chart to be displayed. Every user has got an opportunity to build “their own” Gantt chart, where they can see the set of tasks assigned to them, and every task can be highlighted by a necessary color depending on its status, that allows the user to organize their working time in the better way. Additionally GanttChart has particularly flexible creating a Gantt chart with any queries.
Unsere Mitarbeiter haben auch viel Nutzen aus GanttChart für sich gezogen. Flexible Einstellungen der Erweiterung GanttChart ermöglichen es, die abgebildete Darstellung des Gantt-Diagramms an die gewünschten Art und Weise anzupassen. Sowohl Projektleiter, als auch Mitarbeiter haben die Möglichkeit erhalten, ein „eigenes“ Gantt-Diagramm zu erstellen, auf dem genau die Zusammenstellung von Aufgaben und Aufträgen dargestellt wird, die ihnen zugewiesen wurden. Jede Aufgabe kann mit einer beliebigen Farbe entsprechend ihrem Status markiert werden. Das ermöglicht es dem Projektleiter einen schnellen Überblick über den Stand seines Projektes zu geben oder dem einzelnen Mitarbeiter, seine Arbeitszeit besser zu organisieren. Über die Möglichkeit, ein Gantt-Diagramm über eine beliebige Queries zu erzeugen ist das Plug-in GanttChart for ClearQuest besonders flexibel.
read more testimonials
CM-Consult Company is pleased to announce the release of special license packs that include licenses for the most popular CM-Consult products (GanttChart for ClearQuest, ProjectTracker, UML2ClearQuest). Besides, the license packs include one year of advanced technical support that allows you to get consultations of CM-Consult specialists and help in configuring ClearQuest Schema for effective use of GanttChart for ClearQuest and ProjectTracker. License packs also include high-priority modifications for our products made according to your requirements. We often face a situation when our clients use non-standard ClearQuest schemas that require adapting GanttChart for ClearQuest and ProjectTracker. License packs allow our clients to get special versions of GanttChart for ClearQuest and ProjectTrackeradapted according to their requirements.
License packs also allow significantly save money since they include the most popular products at a big discount. You will save from $7817,58 to $44 885 (30%-45%) depending on the License pack type.
Further, our clients will be able to buy additional license packs and single products at a discount between 10% and 25%.
Available Packs: "Starter","Advanced" and "Professional".
The major advantage of the GanttChart tool is the ability to graphically represent states of activities. When you have a large number of activities it is difficult to visually represent and estimate them using the grid view only. In such case, a chart is very useful. Another advantage is the possibility to modify dates of activities in graphic view (i.e. in a chart itself) that simplifies data updating in ClearQuest.
Jesuino Jose de Freitas Neto, IT Executive Manager, Banco do Nordeste do Brazil, Federal Bank of Brazil ![]()
GanttChart for ClearQuest 1.3 is a plug-in for IBM Rational ClearQuest 7.1 or later version. This plug-in is of interest for everybody who uses IBM Rational ClearQuest and who lacks for project management functionality. The module does not substitute the existing project management tools. It just adds operational slices into IBM Rational. For most users, the functions provided by the plug-in are enough for planning and operation management (see more info).
New features in version 1.3:
1. Ability to demonstrate a workload diagram to the owners basing on the selected diagram or general workload by projects:
- Building the owners workload diagram on basis of the Gantt chart built earlier or data from ClearQuest
- Representing the owners workload diagram in two views: In task view with ability to perform planning; In bar chart vie
- Building the workload diagram by owners
- Distributing change requests into basic (for example, tasks that have planned dates and workload), and auxiliary (for example, defects and enhancement requests that do not have planned dates and workload) by workload
- Splitting the workload diagram into sections by owners
- Automatically synchronizing changes in the Gantt chart and the workload diagram to improve the effectiveness of planning
Read more (screenshots and video) -->
Besides, we have published testimonialsof our customers and IBM specialist on GanttChart.
In Articles and Media section, the new articleImplementing IBM RSA and IBM ClearQuest integration: UML to State-Machine with RSA plug-in. Original sources are attached to the article. In the Technical information, release notes etc. section, the following materials have been published:
- GanttChart for ClearQuest. User Guide. Ver 1.3
- UML2ClearQuest. User Guide. Ver 3.0
- GanttChart for ClearQuest. User Guide. Ver 1.2
- GanttChart for ClearQuest. Installation Guide. Ver 1.2
Main contacts
Contents 1. List of Abbreviations and Terms 2. Glossary 3. Introduction 3.1 Field of Application of This Document 3.2 Purpose of This Document 3.3 System Requirements 4. General Description 5. Configuration 5.1 Setting up parameters 5.2 Export and import of settings 6. Using the plug-in6.1 Building a Gantt chart 6.2 Opening forms 6.3 Modifying planned dates 6.4 Reassigning owners 6.5 Owners workload 6.6 Saving changes 6.7 Export information 6.8 Visualization of states 7. Appendix A
List of Abbreviations and Terms
Glossary
IntroductionField of Application of This DocumentThis Guide is intended for users of ClearQuest.Purpose of This DocumentThe document provides users with information on functionality of the GanttChart for ClearQuest application that allows effectively use ClearQuest when planning works and tracking their statuses. The document covers the following topics:
System RequirementsTo be able to use the GanttChart for ClearQuest plug-in you must have
General DescriptionGanttChart for ClearQuest is the plug-in for the Eclipse client for ClearQuest that provides the following opportunities:Configuration
Setting up parameters
Configuration includes setting up the parameters of record types for which the Gantt chart will be build. First, you should set up the connection to the DB (see Figure 1. Setting up the connection to the ClearQuest database).
![]()
Figure 2. Opening the dialog box for adjusting the module settings In the Preferences dialog box, on the left, select CMC Plug-ins/GanttChart for ClearQuest. The Preferences dialog box will open. (see Figure 3. Configuring the module (the ALMRequest entity is taken as an example). This dialog box contains the following tabs:
To finish the configuration, click Apply. Export and import of settingsGanttChart for ClearQuest allows exporting and importing settings. You can do it in the Preferences window using the corresponding buttons (see Figure 7. Buttons for exporting and importing settings).
![]() Figure 7. Buttons for exporting and importing settings To export settings, perform the following steps:
Using the plug-in
Building a Gantt chartSince GanttChart for ClearQuest uses requests selected from the ClearQuest, to build a Gantt chart it is necessary to execute a query that will return the list of records (see Figure 8. Configuring the filter of displayed records).
Opening formsGanttChart for ClearQuest allows opening forms of change requests directly from a Gantt chart. To open a change request form, click the necessary task in the Gantt chart. The ClearQuest form will open where you can perform all regular operations with the request, i.e. view, modify, change its state, etc.![]() Figure 13. ClearQuest Form Opened from a Gantt Chart
Modifying planned datesGanttChart for ClearQuest supports changing planned dates directly from a Gantt chart. To be able to modify planned dates for tasks, you should specify the following parameters:
Reassigning ownersGanttChart for ClearQuest allows assigning owners for change requests directly from a Gantt chart. To make it possible, it is necessary to apply the following settings for the record type:
Owners workloadGanttChart for ClearQuest allows building a workload diagram by owners on basis of data from the Gantt chart built earlier or data from ClearQuest. There are two ways to open the workload diagram:
![]() Figure 23. Synchronous display of diagrams
Saving changesTo save the results of planning in the Gantt chart, you can use two methods (see Figure 17. Saving changes.):
Export informationGanttChart for ClearQuest allows you to export the displayed information to the file in MS Project XML. For export, follow these steps:
Figure 20. Exporting data
Visualization of statesGanttChart for ClearQuest allows you to view a state chart diagram for the selected change request. To do this, follow these steps:
Figure 26. Openning state chart
Figure 27. StateChart Vizualizer
Appendix AExample of ALM-schema configuration The following configuration is given for guidance only. This appendix contains detailed description of configuration and step-by-step instructions for adjusting the ALM-schema:
|
Mail site: http://rational-tools.info (English site) Company site: http://cmcons.com (Russian site) Blog: IBM Blog (English blog) E'mails: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it and This e-mail address is being protected from spam bots, you need JavaScript enabled to view it
Internet: http://www.ibts-online.com E-mail: This e-mail address is being protected from spam bots, you need JavaScript enabled to view it Scheelestr. 108, D-12209 Berlin Tel.: +49 (0)30 755 14 304 Fax: +49 (0)30 755 14 348 |
Contents
1. List of Abbreviations and Terms
2. Glossary
3. Introduction
3.1 Field of Application of This Document
3.2 Purpose of This Document
3.3 System Requirements
4. General Description
5. Configuration
5.1 Setting up parameters
5.2 Export and import of settings
6. Using the plug-in
6.1 Building a Gantt chart
6.2 Opening forms
6.3 Modifying planned dates
6.4 Reassigning owners
6.5 Saving changes
6.6 Export information
6.7 Visualization of states
7. Appendix A
List of Abbreviations and Terms
Abbreviation | Expansion |
CM | Change management |
DB | Database |
Glossary
Term | Interpretation |
ClearQuest | IBM Rational change management system |
Change Request | Document/ ClearQuest object |
Introduction
Field of Application of This Document
This Guide is intended for users of ClearQuest.
Purpose of This Document
The document provides users with information on functionality of the GanttChart for ClearQuest application that allows effectively use ClearQuest when planning works and tracking their statuses.
The document covers the following topics:
- Configuring the application
- Using the application
System Requirements
To be able to use the GanttChart for ClearQuest plug-in you must have
- IBM Rational ClearQuest Eclipse Client 7.0.0 or later version.
General Description
GanttChart for ClearQuest is the plug-in for the Eclipse client for ClearQuest that provides the following opportunities:
- Building a Gantt chart on basis of executed queries. It allows building a chart of any necessary view.
- Visualizing change request hierarchy and relations between the requests in the form of a Gantt chart.
- Visualizing task completion rate.
- Visualizing ratio of planned to actual dates.
- Visualizing change requests using different colour schemes depending on the completion rate and ratio of planned to actual dates.
- Splitting a Gantt chart on sections for visualization of composite requests for more convenient analysis and work planning.
- Changing and saving results of updating planned dates of change requests.
- Assigning owners for change requests.
- Opening forms of change requests from a Gantt chart;
- Printing;
- Visualizing State Chart Diagram;
- Exporting to MS Project XML file.
Configuration
Setting up parameters
Configuration includes setting up the parameters of record types for which the Gantt chart will be build. First, you should set up the connection to the DB (see Figure 1. Setting up the connection to the ClearQuest database).
Figure 1. Setting up the connection to the ClearQuest database
To adjust the module settings, in the Window menu, select Preferences. (see Figure 2. Opening the dialog box for adjusting the module settings).
Figure 2. Opening the dialog box for adjusting the module settings
In the Preferences dialog box, on the left, select CMC Plug-ins/GanttChart for ClearQuest. The Preferences dialog box will open. (see Figure 3. Configuring the module (the ALMRequest entity is taken as an example). This dialog box contains the following tabs:
- Record types - on this tab, you can configure all necessary record types, for which the Gantt chart will be built.
- Record types hierarchy - on this tab, you can set up all necessary relations between change requests:
- Hierarchical relations
- Sequential relations
- Advanced - on this tab, you can adjust additional settings.
- Custom - on this tab, you can adjust some custom settings to make your work with GanttChart for ClearQuest more convenient.
Figure 3. Configuring the module (the ALMRequest entity is taken as an example)
The Record types tab contains the following settings:
- Connection - the list of active ClearQuest connections. In this list, you should select the connection to the user's ClearQuest database.
- Record types - the list of record types that are used in the user's ClearQuest DB. In this list, select the record types that should be used for building the Gantt chart. For every record type, you can set up a number of parameters displayed on the right of the record types list:
- Modify action - the action performed by ClearQuest to modify the change request. It is used for saving planned values for the change requests. This is an optional parameter. You need not set it up unless you need to save changes in the Gantt chart.
- Assign action - the action performed by ClearQuest to transfer a change request into the Assigned state. It is used if it is necessary to automatically transfer a change request into the Assigned state when an owner is assigned to the request. This is an optional parameter. You need not set it up unless you need to automatically transfer a change request into the Assigned state.
- Headline - this field contains a brief description. This is a mandatory parameter.
- Owner - this field contains a name of an owner assigned to a change request. This parameter is optional.
- Plan start date - this field contains a planned date of starting work in the ClearQuest request. This field is not mandatory for change requests with child requests.
- Plan end date - this field contains a planned date of finishing work in the ClearQuest request. This field is not mandatory for change requests with child requests.
- Actual start date - this field contains an actual date of starting work in the ClearQuest request. This field is not mandatory for change requests with child requests.
- Actual end date - this field contains an actual date of finishing work in the ClearQuest request. This field is not mandatory for change requests with child requests.
- Completing percent - this field contains the task completion rate. Its value should fall into the range between 0 and 100. This parameter is optional.
Figure 4. Configuring the hierarchy for the ALMActivity entity
For setting up relations between change requests, you should open the Record types hierarchy tab (see Figure 4. Configuring the hierarchy for the ALMActivity entity). This tab contains the Record types list containing the list of record types that were configured on the Record types tab. For every record type, you can set up a number of relationship parameters:
- Parameters for hierarchical relations, that are displayed in a Gantt chart as aggregated tasks:
- Parent record - a parent change request for the request that is currently being configured.
- Child record - a child change request for the request that is currently being configured.
- Parameters for the sequential relations:
- Predecessor record - a change request that goes before the request that is currently being configured.
- Successor record - a change request that goes after the request that is currently being configured.
Figure 5. Additional settings
The Advanced tab contains the following settings:
- Color theme - the color scheme that will be applied to a Gantt chart.
- Use color events - if this option is selected, all tasks will be highlighted by different colors depending on their states:
- Grey - the task has not been planned.
- Blue - the task has been planned and the plan end date has not come yet.
- Yellow - the task has been planned and is in progress.
- Crimson - the task has been planned, but the planned start date is past due.
- Red - the task has been planned and the planned finish date is past due.
- Green - the task is completed.
- Split chart by section - if this option is selected, the Gantt chart is divided into sections concerning records of the first level of hierarchy.
- Use AMWorkActivitySchedule package - if this option is selected, you can use the AMWorkActivitySchedule package.
- Use users - allows creating lists of owners for using them in the Gantt chart:
- Use the record choice list - creates the list of owners that corresponds to the selected record and its Owner field;
- Use users record type - creates the list of owners on basis of the Users record type;
- Use specified record type - creates the list of owners on basis of the specified type of record Record type and its main field User name, which contains the owner name.
- Enable change preferences by administrators only - if this option is selected, the settings can be edited only by users with Super user and Security admin privileges.
Figure 6. Custom settings
The Custom tab contains the following elements:
- Auto build queries - allows defining the list of queries. As a result of execution of these queries, a Gantt chart will be automatically built.
To finish the configuration, click Apply.
Export and import of settings
GanttChart for ClearQuest allows exporting and importing settings. You can do it in the Preferences window using the corresponding buttons (see Figure 7. Buttons for exporting and importing settings
).
Figure 7. Buttons for exporting and importing settings
To export settings, perform the following steps:
- In the Preferences window, click Export.
- In the dialog box, select the directory and specify the name of the file that will store the imported settings.
To import settings, perform the following steps:
- In the Preferences window, click Import.
- In the dialog box, select the file with the settings.
- To apply the new settings, click Apply.
Using the plug-in
Building a Gantt chart
Since GanttChart for ClearQuest uses requests selected from the ClearQuest, to build a Gantt chart it is necessary to execute a query that will return the list of records (see Figure 8. Configuring the filter of displayed records).
Figure 8. Configuring the filter of displayed records
In the CMC Plug-ins menu, select GanttCart for ClearQuest (see Figure 9. Launching the plug-in). The new tab GanttCart for ClearQuest will open (see Figure 10. Plug-in's tab displayed in ClearQuest).
Figure 9. Launching the plug-in
On the GanttCart for ClearQuest tab, in the Executed queries list, select the executed query and, to build a Gantt chart, click Fill from result (see Figure 10. Plug-in's tab displayed in ClearQuest, Figure 11. Running a query).
Figure 10. Plug-in's tab displayed in ClearQuest
Figure 11. Running a query
As a result of the plug-in installation and configuration, you will get the Gantt chart (see Figure 12. Displaying the Gantt chart).
Figure 12. Displaying the Gantt chart
Opening forms
GanttChart for ClearQuest allows opening forms of change requests directly from a Gantt chart. To open a change request form, click the necessary task in the Gantt chart. The ClearQuest form will open where you can perform all regular operations with the request, i.e. view, modify, change its state, etc.
Figure 13. ClearQuest Form Opened from a Gantt Chart
Modifying planned dates
GanttChart for ClearQuest supports changing planned dates directly from a Gantt chart. To be able to modify planned dates for tasks, you should specify the following parameters:
- Fields containing planned dates.
- Modify action for a record.
To modify planned dates for a task on a Gantt chart, you should pull one of the tasks ends by the cursor.
GanttChart for ClearQuest also supports grouped operations for tasks of a Gantt chart.
- Selecting a group of tasks. You can select multiple tasks by clicking Shift or Ctrl and selecting the necessary tasks. Also, you can select a group of tasks by clicking Ctrl and then, using the right mouse button, selecting an area on a Gantt chart where the necessary tasks are displayed (see Figure 14. Selecting a group of tasks
- )
Figure 14. Selecting a group of tasks
- Modifying a group of tasks. To modify a group of tasks, you should modify one of the selected tasks holding the Ctrl button.
- Modifying connected tasks. To modify connected tasks, you should modify one of the selected tasks holding the Shift button.
- Aggregated tasks. When you move an aggregated task, its child tasks are also moved, including the aggregated ones.
The plug-in allows evaluating how the new planned dates differ from the previous ones. To do it, right-click a Gantt chart and select Show Planned Dates (see Figure 15. Displaying the shift between old and new planned dates
). In the chart, additional green and red lines appear indicating the shift between old and new planned start dates and planned finish dates correspondingly. If a task has actual dates, these lines will indicate the shift between actual and planned dates of the task.
Figure 15. Displaying the shift between old and new planned dates
Reassigning owners
GanttChart for ClearQuest allows assigning owners for change requests directly from a Gantt chart. To make it possible, it is necessary to apply the following settings for the record type:
- Owner field.
- Modify or Assign action.
To assign a new owner or reassign an existing owner, do the following:
- On a Gantt chart, right-click a task and select Assign owner.
- The dialog appears (see Figure 16. Selecting an owner
- ) with the list of available owners. To find a necessary owner in a large list, use the filter field.
Figure 16. Selecting an owner
- Click OK to save changes, or Cancel to quit without saving.
- Before you have saved the new settings, you can restore the previous owner by clicking Restore.
Saving changes
To save the results of planning in the Gantt chart, you can use two methods (see Figure 17. Saving changes.):
- Complete saving of all changes Click
(Apply changes). All changes made in the Gantt chart are saved into the ClearQuest change requests. - Selective saving. Click
(Analyse changes). The dialog box with the list of change requests to be saved and changed fields will open (see Figure 18. Selecting tasks for saving - ). In this dialog box, you can select the change requests to be saved. Besides, you can select the following options:
- Save plan dates if actual dates exist - if this option is selected, the list of change requests to be saved will be supplemented with the change requests with the actual dates, for which the planned dates were modified;
- Update plan dates for summary tasks - if this option is selected, the list of change requests to be saved will be supplemented with the change requests that correspond to the aggregated tasks of the Gantt chart and for which the planned dates and the Modify action are specified in the settings of GanttChart for ClearQuest.
Figure 17. Saving changes.
Figure 18. Selecting tasks for saving
The process of updating the planned dates is logged into the console window of the Eclipse client for ClearQuest (see Figure 19. Log of the planned dates saving process):
Figure 19. Log of the planned dates saving process
Export information
GanttChart for ClearQuest allows you to export the displayed information to the file in MS Project XML. For export, follow these steps:
- Click "Export";
Figure 20. Exporting data
- Set the file name that you want to export the information;
Figure 21. Selecting file name
- Launch MS Project and select "FileaOpen";
- Choose a file export;
Figure 22. Opening file
- Select "Append the data to active project"
Figure 23. Import Wizard
- The new plan to add a display field "Text1" and "Text2", which contain CQID information and the type of record ClearQuest;
Figure 24. Inserting text fields
- Information on the planned dates stored in the baseline, so to display it on the MS Project Gantt chart to choose the type of View "Tracking Gantt"
Figure 25. View "Tracking Gantt"
Visualization of states
GanttChart for ClearQuest allows you to view a state chart diagram for the selected change request. To do this, follow these steps:
- At the required change request, right-click and choose "Show state chart"
Figure 26. Openning state chart
- On the resulting graph displays the states and transitions between states. In parentheses at the transitions is also reflected in the number of transitions executed during the entire lifecycle of the change request.
Figure 27. StateChart Vizualizer
Appendix A
Example of ALM-schema configuration
The following configuration is given for guidance only.
This appendix contains detailed description of configuration and step-by-step instructions for adjusting the ALM-schema:
- Changes in the schema. Since the ALM-schema does not have all necessary fields for setting planned and actual dates, you should add them using ClearQuest Designer. For the ALMActivity record type it is necessary to add the following fields:
- Plan_start - planned start date, type DATE_TIME;
- Plan_start - planned end date, type DATE_TIME;
- Fact_start - actual start date, type DATE_TIME;
- Fact_end - actual end date, type DATE_TIME;
- Percent_complete - completion rate, type INT;
- PredecessorActivity - predecessor for a task, type REFERENCE_LIST for the record type ALMActivity;
- Configuring the application
- Configuring fields for ALMRequest:
- Configuring fields for ALMTask:
- Configuring fields for ALMAcivity:
- Configuring relations for ALMTask:
- Configuring relations for ALMRequest:
CM-Consult announced that it now provides a free, fully-functional and unrestricted edition of its flagship product GanttChart for ClearQuest . People who download this free edition are entitled to 15 days of free technical support as well.
CM-Consult products intended to provide business continuity are added to the international solutions catalogue IBM Global Solutions Directory . IBM Corporation adds to this directory the most significant solutions that are based on IBM technologies and have been successfully implemented for a number of customers.
GanttChart for ClearQuest is added to the IBM Global Solutions Directory with the ID 41151. GanttChart for ClearQuest is a plug-in for IBM Rational ClearQuest 7.0, 7.1 or later version. This plug-in is of interest for everybody who uses IBM Rational ClearQuest and who lacks for project management functionality. The module does not substitute the existing project management tools. It just adds operational slices into IBM Rational. For most users, the functions provided by the plug-in are enough for planning and operation management.
"Recently our solution ProjectTracker has been added to the IBM Global Solutions Directory and now the turn of GanttChart for ClearQuest has come. This solution was developed as a result of an effort of both our specialists and our clients. The idea to create such solution has emerged as a result of close cooperation with our customers and deep understanding of their business problems. In most companies we have cooperated with the planning horizon for tasks and works is measured in months and quarters, but not years. Project managers have often to modify work schedule, update it, establish priorities, and set responsible persons. ClearQuest is a powerful tool that simplifies this process, but it has its limits. In ClearQuest, planning and representation of tasks is performed in flat view, but all managers are used to using the Gantt chart for planning. Unfortunately, the standard ClearQuest package does not provide users with such opportunity. GanttChart for ClearQuest allows managers to save a lot of time while preparing plans of work/tasks and exercising operational control over the project. In absolute terms, a manager spends about 12-16 minutes on rescheduling the average group of connected tasks without using GanttChart. Using GanttChart for ClearQuest, the same operation takes 10-15 seconds. So, using GanttChart for ClearQuest results in increasing the manager’s efficiency and manageability of the whole project. We are greatly pleased to have gained recognition of our contribution from IBM Corporation", Alexander Novichkov , the general director of CM-Consult, sais.
Our product GanttChart for ClearQuest, are now part of the IBM Global Solutions Directory, an online directory containing applications, tools and services from IBM and IBM business partners.
GanttChart for ClearQuest ID 41151
More info:
- GanttChart for ClearQuest have been published in IBM Global Solutions Directory
- CM-Consult Ltd announced the sale start of the innovative solution GanttChart for ClearQuest.
- GanttChart v 1.0 for ClearQuest. The module of the visualization of the ClearQuest tasks hierarchy a
- Visualization of the Change Request Hierarchy in IBM Rational Using the GanttChart
- GanttChart v 1.0 for ClearQuest video (with audio)
CM-Consult Ltd and Rational-Tools project announced the sale start of the innovative solution GanttChart for ClearQuest. he following special winter discounts are valid through the February 25th, 2010:
- 50% discount for 5 and more licenses purchase. The discount is applicable for all IBM business partners if used for their own projects. (request it on This e-mail address is being protected from spam bots, you need JavaScript enabled to view it with the partner status link).
- 25% discount for any number of licenses. Applicable only for the clients purchased ProjectTracker.
- 20% discount for 10+ licenses one-time purchase.
Ad hoc planning and operational management. The module of the visualization of the ClearQuest tasks hierarchy as Gantt diagram
The module is made in the form of Plug-in for IBM Rational ClearQuest 7.0 and upper. This module is intended for every person who uses IBM Rational ClearQuest and is short of project management capabilities. The module does not substitute for existing project management tools but adds the operational sections into IBM Rational. For the most experienced users the functions of this module will be absolutely enough for ad hoc planning and operational management of their projects. The module has no analogues in the world!
CM-Consult GanttChart is featured in the IBM Global Solutions Directory ID 41151
GanttChart for ClearQuest 1.4 is fully compatible with IBM Rational ClearQuest v. 8.0
| |












Mail site:
Contacts in Germany, IBTS - International Business & Technology Solutions 


































Figure 25. View "Tracking Gantt"